Building Your Dream Home Continued...
5 - FRAMEWALK: After the first inspections, your builder will
invite you to walk through your home. At this point you will
be able to visualize more easily what your dream home will look
like. At this point, all walls and trusses will be framed, and the roof
sheathing will be installed. Another framing inspection will also
take place.
6 - ROOFING STAGE: Once the framing has undergone
inspection, your builder will begin enclosing your home. All
exterior sheathing, shingles, the roofing system, windows, and doors
will be installed at this point.
7 - HOUSE WRAP: Certain climates offer a higher risk of
moisture, mold, and wood rot occurring in the home. Therefore, a
protective barrier, known as a house wrap, is installed to prevent the
structure of your home and its interior from getting wet. The house
wrap ensures that all moisture will remain outside the home.
8 - MECHANICAL INSTALLATION: This stage is very
critical and occurs before the installation of the sheet rock. It is
at this point that all mechanical components and wiring is installed.
It is incredibly important that everything be installed correctly, since
it will soon be covered by sheetrock and will be much less accessible.
At this point, you may want to consider having a home fire sprinkler
system or home entertainment system installed. During this stage,
plumbing and mechanical components will be roughed in. Venting,
ductwork, a water heater, and the HVAC system will be installed.
Any exterior finishes, such as masonry and wood, will be installed at
this point, as well.
... Previous - Continue ...